Loft, extension, kitchen, heat pump, driveway — or a whole-house refurb?

Put a range on the works before you collect quotes

Forty-plus compiled 2026 UK project bands. Change the size, spec, region, access, whether you live in, VAT treatment, contingency and optional extras. Illustrative only — not a tender and not a builder.

RL Published by Rodway Labs — not a contractor
Project Cost Lab editorial · 22 September 2026 · Ranges last checked September 2026
1Pick a job40+ UK project types
2Tune itSize, spec, access, extras
3RangeLow / mid / high with VAT

POSITIONING

The mid figure is a band, not a price

Access, spec, region, VAT and what you add on move the number more than the project name. Use the range to size a budget, then get written quotes on the same drawing.

Estimate a range

UK cost tools — illustrative only

Not a builder, architect or quantity surveyor. We do not inspect properties or arrange trades.

Ranges compiled from 2026 UK trade guides. Your site will differ.

CALCULATOR

Project cost range — 2026 illustration

Filter a category, then edit every input that applies to that job.

Optional extras for this job

Most work on an existing dwelling is standard-rated. New dwellings and some energy-saving measures can differ — this tool does not decide your VAT treatment.

Low in this run
High in this run
Size used
Typical programme

How the mid is built

Works (after spec, access, region)
Extras total
Subtotal ex-VAT
VAT on this run
Contingency
Illustrated mid

Usually in the band.

Usually outside the band.

Not a quote. Planning fees, Party Wall awards, temporary accommodation, furniture and professional fees are omitted unless you tick them. Ground conditions, asbestos, services diversions and hidden rot sit outside every published range.

EXAMPLE REAR DORMER · UK MID · VAT ON · 10% CONTINGENCY

Change any input and this box follows the live run.

What you can price in this lab

Each type has its own size unit and extras. Open the catalogue for the compiled mid before factors.

Guides with numbers